2005

  • Concession auction for the construction of Baguari HPP (installed capacity of 140 MW, 51% Neoenergia) and SHPP’s Goiandira (installed capacity – 27 MW) and Nova Aurora (installed capacity – 21 MW).
  • Incorporation of Afluente Geração e Transmissão de Energia Elétrica S.A. (installed capacity 18 MW) to meet deverticalization guidelines in the distribution segment pursuant to Law No. 10,848/2004, and take over the generation and transmission assets of COELBA.