2006

  • Concession auction for the construction and exploitation of the PCHs Pirapetinga (installed capacity 20 MW), Pedra do Garrafão (installed capacity 19 MW) and UHE Corumbá III (installed capacity 96.70% (sic) Neoenergia) and the Dardanelos UHE (installed capacity 261 MW, 51% Neoenergia).