2008

  • Commercial operation of Termoaçu TPP.
  • Concession auction for Baixo Iguaçu TPP (installed capacity 350 MW, 70% Neoenergia).
  • Authorization for construction of Sítio Grande SHPP (installed capacity 25 MW).