2013

  • Baixo Iguaçu works start.
  • Wind farms Mel and Arizona 1 start commercial operations.
  • Completion of works of wind farms Caetité 2 and 3, and Calango 1, 2, 3, 4 and 5 with the status of “fit for commercial operation” recognized by ANEEL.
  • ANEEL transmission auction 001/2013 with the purchase of lot G for the construction, operation and maintenance of a 500kV Transmission Line extending for approximately 196 km, with connection bays at substations Campina Grande III, in Paraiba and Ceará-Mirim II in Rio Grande do Norte.
  • Completion of the sale of Termoaçu HPP to Petrobras, with the transfer of a 23% equity interest to Neoenergia.